News & Events Home   /    News    /    Small Ball Mill of 2t/h for Gold Ore

Jaw Crusher's Maintenance and Usage

E-mail: market@hxjq.com
What can help you, fill out the form below and submit, we will get back to you as soon as possible. Send a message

jaw crusher


1. Feeding equipment after normal running.

2. Material shall be fed evenly in order to prevent side load or side weight increase.

3. Generally, temperature rise o bearing shall not exceed 35℃ and maximum temperature shall not exceed 70 ℃, or stop and get rid of the trouble.

4. Stop feeding before stopping equipment, and cut motor after completely discharging materials in chamber. 

5. Cut motor immediately when equipment is stopped by materials block and restart the equipment after completely discharging materials in chamber.

6. Change the abraded end for the other end.

Date: 2012-03-17

Send Enquiry

Please enter your requirement and contact information and we'll get back to you as soon as possible.

Your email
Your phone/whatsapp *
Requirements